Permits

Guidelines

  • Projects that require a permit must be filled out and turned in before they are started.
  • For additions and building structures a drawing of the structure on the property showing where it is located and nearby streets is required.
  • Once the permit is turned in with all the required paperwork, it is required that you give us 5 to 10 business days to either approve or decline the permit.
  • Disposal deposit may be required for some projects and must be payed when the permit is picked up.